===== Διακοπή ρεύματος και επαναφορά ===== | ===== Διακοπή ρεύματος και επαναφορά ===== | ||
- | PRINT BEFORE USE! | + | PRINT BEFORE USE!\\ |
Material may not be available during shutdown process. | Material may not be available during shutdown process. | ||
- | Updated | + | Updated |
\\ | \\ | ||
* Altus KVM 10.1.2.10 | * Altus KVM 10.1.2.10 | ||
* Cisco switch port 6: trunk for recovery | * Cisco switch port 6: trunk for recovery | ||
* Backup! Transfer to safe media! | * Backup! Transfer to safe media! | ||
+ | * Windows 7 java6 VM on 10.1.2.40 (VLAN74: 10.7.4.4, MGMT: 10.1.2.193, Internet not available) | ||
==== Διακοπή ρεύματος ==== | ==== Διακοπή ρεύματος ==== | ||
Poweroff: | Poweroff: | ||
=== Επίπεδο 1 === | === Επίπεδο 1 === | ||
+ | |||
+ | == Unmount backup filesystem == | ||
+ | - uranus: umount /mnt | ||
+ | - gaia: umount /mnt | ||
+ | |||
+ | == Terramaster F4-424 NAS == | ||
+ | - Shutdown | ||
+ | |||
+ | == EMC VNXe3100, 10.1.2.9 == | ||
+ | Poweroff procedure (+WAIT, UNPLUG!) | ||
+ | |||
+ | Shut down the system | ||
+ | | ||
+ | The shutdown process can take between 25 to 45 minutes to complete. | ||
+ | During this time, the connection to the system will be lost and | ||
+ | you will not have access to Unisphere or the online help. | ||
+ | | ||
+ | 1. From Unisphere, select Settings > Service System. | ||
+ | 2. Enter the Service password to access the Service System page. | ||
+ | 3. Under Service Actions, select Shut Down System. | ||
+ | 4. Click Execute service action to shut down the | ||
+ | | ||
+ | 5. In the Service Confirmation dialog box, click OK. | ||
+ | 6. Check the status of the shutdown process by looking at the | ||
+ | SP LED indicators: | ||
+ | | ||
+ | On VNXe3100 and VNXe3150 systems, the shutdown process is complete | ||
+ | when only the Storage Processor Power LEDs are blinking and all | ||
+ | other Storage Processor LEDs are off. | ||
+ | | ||
+ | 7. If you are relocating hardware, disconnect cables in the | ||
+ | | ||
+ | | ||
+ | Disconnect the power cables from disk-processor enclosure (DPE) | ||
+ | to power down the SPs. | ||
+ | Disconnect the power cable from the DAEs to power them down. | ||
+ | |||
+ | |||
== HP DL145G2 == | == HP DL145G2 == | ||
- Close control units poweroff | - Close control units poweroff | ||
- | - titan (old printserver), | + | - (NOT!) |
- csforum, iLO 10.1.2.30\\ | - csforum, iLO 10.1.2.30\\ | ||
- aeolus, iLO 10.1.2.150\\ | - aeolus, iLO 10.1.2.150\\ | ||
Line 31: | Line 70: | ||
| | ||
== HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 == | == HP DL380G6 esxi5, 10.1.2.205, iLO 10.1.2.105 == | ||
- | - alumni (www)\\ | + | - alumni (alumni-vlan74)\\ |
- dl380ws* | - dl380ws* | ||
== HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == | == HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == | ||
- | - titan-printserver (new printserver, | + | - titan-printserver (new printserver, |
- mysql-server (dbserver)\\ | - mysql-server (dbserver)\\ | ||
- calliope-www (cse www, calliope-vlan74)\\ | - calliope-www (cse www, calliope-vlan74)\\ | ||
Line 46: | Line 85: | ||
== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
- | * examservers | + | * (NOT!) |
=== Επίπεδο 2 === | === Επίπεδο 2 === | ||
Line 53: | Line 92: | ||
* gaia | * gaia | ||
- | == Dell R630 #1 (DOWN), 10.1.2.41, iLO 10.1.2.111 == | + | == Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == |
* uranus-nfs | * uranus-nfs | ||
=== Επίπεδο 3 === | === Επίπεδο 3 === | ||
- | |||
- | == EMC VNXe3100, 10.1.2.9 == | ||
- | Poweroff procedure (+WAIT, UNPLUG!) | ||
- | |||
- | Shut down the system | ||
- | | ||
- | The shutdown process can take between 25 to 45 minutes to complete. | ||
- | During this time, the connection to the system will be lost and | ||
- | you will not have access to Unisphere or the online help. | ||
- | | ||
- | 1. From Unisphere, select Settings > Service System. | ||
- | 2. Enter the Service password to access the Service System page. | ||
- | 3. Under Service Actions, select Shut Down System. | ||
- | 4. Click Execute service action to shut down the | ||
- | | ||
- | 5. In the Service Confirmation dialog box, click OK. | ||
- | 6. Check the status of the shutdown process by looking at the | ||
- | SP LED indicators: | ||
- | | ||
- | On VNXe3100 and VNXe3150 systems, the shutdown process is complete | ||
- | when only the Storage Processor Power LEDs are blinking and all | ||
- | other Storage Processor LEDs are off. | ||
- | | ||
- | 7. If you are relocating hardware, disconnect cables in the | ||
- | | ||
- | | ||
- | Disconnect the power cables from disk-processor enclosure (DPE) | ||
- | to power down the SPs. | ||
- | Disconnect the power cable from the DAEs to power them down. | ||
- | |||
== HP DL145G2 == | == HP DL145G2 == | ||
- | - scylla, iLO 10.1.2.45\\ | + | - scylla |
- rescue, iLO 10.1.2.49\\ | - rescue, iLO 10.1.2.49\\ | ||
Line 96: | Line 105: | ||
- gatepc74\\ | - gatepc74\\ | ||
- gatepc76\\ | - gatepc76\\ | ||
- | - clonezilla SE\\ | + | - clonezilla SE (drbl)\\ |
- charybdis\\ | - charybdis\\ | ||
Line 103: | Line 112: | ||
* Shutdown 10.7.4.7 | * Shutdown 10.7.4.7 | ||
* Shutdown 10.7.4.125 | * Shutdown 10.7.4.125 | ||
+ | * Shutdown Windows 7 java6 VM on 10.1.2.40 | ||
* Shutdown 10.1.2.40 | * Shutdown 10.1.2.40 | ||
* Shutdown 10.1.2.41 | * Shutdown 10.1.2.41 | ||
+ | * Shutdown 10.1.2.205 | ||
== Power cables == | == Power cables == | ||
Line 130: | Line 141: | ||
- 1x rescue UPS | - 1x rescue UPS | ||
- | == EMC VNXe3100, 10.1.2.9 | + | == Terramaster F4-424 NAS == |
- | Power up the system (20+ minutes! Check www!) | + | |
- | + | ||
- | To power up a system that is fully powered down: | + | |
- | 1. Reconnect the power cables to each DAE in the following exact order: | + | |
- | DAE 0 | + | |
- | DAE 1 | + | |
- | DAE 2 | + | |
- | Power up any remaining DAEs in ascending order. | + | |
- | + | ||
- | The green Power Status LED powerlines.gif on each DAE turns on. | + | |
- | For more information on the LEDs, see System LED displays. | + | |
- | 2. Reconnect the power cables to each SP in exactly this order: | + | |
- | SP A | + | |
- | SP B | + | |
- | + | ||
- | The green Power Status LED on each SP turns on. | + | |
== HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | ||
+ | Add " | ||
- gatepc73\\ | - gatepc73\\ | ||
- gatepc74\\ | - gatepc74\\ | ||
Line 155: | Line 152: | ||
== HP DL145G2 == | == HP DL145G2 == | ||
- | - titan (old printserver), | + | - (NOT!) |
- csforum, iLO 10.1.2.30\\ | - csforum, iLO 10.1.2.30\\ | ||
- aeolus, iLO 10.1.2.150\\ | - aeolus, iLO 10.1.2.150\\ | ||
- | - glaucus\\ | + | - glaucus, iLO 10.1.2.29\\ |
- scylla, iLO 10.1.2.45\\ | - scylla, iLO 10.1.2.45\\ | ||
- rescue, iLO 10.1.2.49\\ | - rescue, iLO 10.1.2.49\\ | ||
Line 165: | Line 162: | ||
=== Επίπεδο 2 === | === Επίπεδο 2 === | ||
- | == Dell R630 #1 (DOWN), 10.1.2.41, iLO 10.1.2.111 == | + | == Dell R630 #2 (DOWN), 10.1.2.41, iLO 10.1.2.111 == |
* uranus-nfs | * uranus-nfs | ||
* check students FS | * check students FS | ||
* check grads FS | * check grads FS | ||
* check staff FS | * check staff FS | ||
- | * check quotas | + | * quotaoff -a |
- | * mount /mnt | + | * quotacheck -a |
+ | * quotaon -a | ||
== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
* gaia | * gaia | ||
- | * mount /mnt | ||
- | |||
=== Επίπεδο 3 === | === Επίπεδο 3 === | ||
Line 183: | Line 179: | ||
- calliope-www (cse www)\\ | - calliope-www (cse www)\\ | ||
- titan-printserver (new printserver)\\ | - titan-printserver (new printserver)\\ | ||
- | - mysql-server (NOT!)\\ | + | - mysql-server (Only fall semester)\\ |
== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == | == HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == | ||
Line 190: | Line 186: | ||
== HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == | ||
- engineering www (jupiter)\\ | - engineering www (jupiter)\\ | ||
- | - charybdis | + | - (NOT!) |
== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | == Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == | ||
- | * examservers | + | * (NOT!) |
== scylla mounts == | == scylla mounts == | ||
Line 208: | Line 204: | ||
* Z-printer storage poweron | * Z-printer storage poweron | ||
- | == Rest == | + | == EMC VNXe3100, 10.1.2.9 |
- | | + | |
+ | |||
+ | To power up a system that is fully powered down: | ||
+ | 1. Reconnect the power cables to each DAE in the following exact order: | ||
+ | DAE 0 | ||
+ | DAE 1 | ||
+ | DAE 2 | ||
+ | Power up any remaining DAEs in ascending order. | ||
+ | |||
+ | The green Power Status LED powerlines.gif on each DAE turns on. | ||
+ | For more information on the LEDs, see System LED displays. | ||
+ | | ||
+ | SP A | ||
+ | SP B | ||
+ | |||
+ | The green Power Status LED on each SP turns on. | ||
+ | |||
+ | * uranus, gaia mount /mnt | ||
== Close control units == | == Close control units == |